Monday, March 26, 2012

Office/Studio Update

This was a productive weekend. First, I finished framing the heat duct and then hung fire rated drywall around it.


Then I started the mold and moisture resistant drywall on the walls. There are tons of electrical boxes and each one needed to be cut out.


I finished around half of the drywall.