Friday, May 31, 2013

Front Yard Reconstruction: Fountain Repair

Rains caused the ground to settle. The poor and meager 4" foundation I placed below grade shifted and the heavy fountain nearly tipped over. To fix it, I dug out almost 30" of dirt to make sure I was on solid ground. Then I packed in 5 inches of gravel. Next I am going to place a 2 foot cubed foundation made of cinder blocks and packed gravel.

No comments:

Post a Comment